Field Renovation Updates
Updates 9/30
Current Updates:
- Turf Leveling: Final leveling has taken place and is ready for sod.
- Grass: Seeding has taken place around the field and sod will be installed the week of 9/30 weather pending.
- Walkway: concrete has been poured, The majority of work has taken place for the walkway around the field.
- Plumbing/Electrical for Concession stand: Lines will be run to the field underground for the concession stand during fall break.